Construction Waste Removal in Westminster
Skips for inert construction waste, where weight rather than volume decides what you can load.
Skips for inert construction waste, where weight rather than volume decides what you can load.
Construction waste is dense. Brick, concrete, tile, soil and hardcore all weigh far more per cubic yard than household or office waste, and that single fact governs almost every decision about which skip to use and how far to fill it.
| Service | Construction Waste |
|---|---|
| Skip sizes | 2, 4, 6 and 8 cubic yards |
| Areas | Westminster, Victoria, Pimlico, Marylebone, Paddington, St James's |
| Permits | Highway permits applied for by us to Westminster City Council |
| Opening hours | Monday–Friday 9:00am–5:00pm · Saturday and Sunday closed |
| Branches | 5 across the City of Westminster |
Every skip has a safe working weight as well as a volume. With mixed household waste you will usually fill the space before you reach the weight. With construction waste the reverse is true: a skip of broken concrete can reach its limit at well under half full.
An overloaded skip cannot be lifted onto the lorry safely or legally, so it will not be collected until the excess is removed by hand. The usual outcome is a wasted visit and a delay on site. The way to avoid it is simple: for heavy inert material, book a smaller skip and expect to part-fill it.
A clean inert load — just brick, concrete, stone and hardcore, with no timber, plastic, plasterboard or general rubbish mixed in — can be processed as recycled aggregate. A load contaminated with other materials cannot, and is handled as mixed waste.
On a site producing both, the practical approach is two containers: one for clean hardcore and one for everything else. It takes a little discipline from the people loading, but it is usually the cheaper route and it is better for the material.
Excavated soil is heavier again, especially after rain, and the quantity is easy to underestimate: a small excavation produces a lot more spoil than the hole suggests, because soil bulks up once it is dug out.
If the soil may be contaminated — from a former industrial use, an old fuel tank or made ground — say so before anything is loaded. Contaminated soil is classified differently and cannot be mixed into a general inert load. Where there is doubt, it needs testing first.
Construction waste is business waste, so the duty of care under section 34 of the Environmental Protection Act 1990 applies. Waste must only be passed to an authorised person, and a waste transfer note should record each transfer.
On a site of any size the principal contractor will expect to see that the carrier is registered with the Environment Agency and will want the transfer notes for the project file. Ask for the paperwork at the point of collection.
Plasterboard is the most commonly mishandled material on a refurbishment. It is not hazardous, but gypsum is high in sulphate and cannot be landfilled with biodegradable waste, so it must be kept out of the general mixed skip.
On a strip-out producing a significant quantity of board, the answer is a dedicated container. On a smaller job, keeping it bagged and separate until collection is usually enough. Either way, tell us at the booking stage.
Capacity is a guide for ordinary mixed waste. Heavy material such as rubble reaches the weight limit long before the skip is full, and on many central London streets the available kerb space caps the size.
Full skip size guide →20–30 bin bags
Very small clear-outs, a single room of DIY waste, or heavy rubble where weight limits the load before volume does.
☎ Call about a 2 yard30–40 bin bags
Small household clearances, garden waste, bathroom rip-outs and modest DIY projects.
☎ Call about a 4 yard50–60 bin bags
Kitchen and bathroom refits, full-room refurbishments and medium house clearances.
☎ Call about a 6 yard60–80 bin bags
Larger refurbishments, builders waste and whole-property clearances.
☎ Call about a 8 yardUsually a small one, part-filled. A 2 or 4 yard skip is often the right choice for dense rubble because the weight limit arrives long before the container is full. Tell us the material and we will advise on the fill level.
You can, but a clean inert load of brick, concrete and hardcore can be recycled as aggregate, while a mixed load cannot. On a job producing both, two containers is usually cheaper than one mixed skip.
Yes, if it is uncontaminated. Soil is very heavy, particularly when wet, so expect to part-fill. If there is any reason to suspect contamination from a previous use, say so before loading as it is classified differently.
No. Plasterboard is high in sulphate and cannot be landfilled with biodegradable waste, so it must be kept separate from the general load. On a strip-out producing a lot of it, ask for a dedicated container.
Yes. Construction waste is business waste and the duty of care under section 34 of the Environmental Protection Act 1990 applies. Keep the transfer note for the project file and check the carrier is registered with the Environment Agency.
It will not be collected. A skip loaded above its rim or over its safe working weight cannot be lifted safely or legally. If a load is approaching the limit, stop and call us so an exchange can be arranged instead.
Every branch offers this service. Call the one closest to where the skip will stand.
| Branch | Address | Covers | Phone |
|---|---|---|---|
| Skip Hire Westminster | 95 Victoria St, London SW1H 0HW | Westminster, Victoria, St James's, Millbank | 020 4630 7043 |
| Skip Hire Victoria | 10 Greycoat Pl, London SW1P 1SB | Victoria, Westminster, Pimlico, St James's Park | 020 4652 8716 |
| Skip Hire Pimlico | 46A Churton St, Pimlico, London SW1V 2LP | Pimlico, Churton Street, Warwick Square, Lupus Street | 020 4652 9019 |
| Skip Hire Marylebone | 36a New Cavendish St, London W1G 8UF | Marylebone, Fitzrovia, Harley Street, Portland Place | 020 4634 1099 |
| Skip Hire Paddington | 145C Praed St, Tyburnia, London W2 1RL | Paddington, Tyburnia, Bayswater, Little Venice | 020 3928 8624 |
2 and 4 yard skips for small jobs and tight streets.
6 yard skips for kitchen and bathroom refits.
8 yard skips for renovation and trade waste.
Office, retail and fit-out waste with transfer notes.
Flat, probate and end-of-tenancy clearances.
Call with the postcode, the waste and the dates and we will tell you what fits.